GREATER ROCHESTER
INT'L AIRPORT
ESI retrofitted existing fixtures with an RGBW capable kit, giving deaf and hearing impaired travelers the ability to travel independently.

LAKE ZURICH
HIGH SCHOOL
Energy Solutions International lit the gymnasium at Lake Zurich High School in Illinois using the ME Series, click the button below to read about the project!

BUNCOMBE COUNTY
SCHOOL SYSTEM
ESI retrofitted over 50,000 fixtures from T8 fluorescent to LED. Through this process, Buncombe County Schools is expected to save over $900,000 annually!

LIFE TIME FITNESS
ESI designed 26 custom skus to upgrade or retrofit every Life Time Fitness location in the U.S. Ramping up production, we shipped one location per day for 100 days to meet the timeline of the project.
LIFE TIME FITNESS
ESI designed 26 custom skus to upgrade or retrofit every Life Time Fitness location in the U.S. Ramping up production, we shipped one location per day for 100 days to meet the timeline of the project.

Massachusetts Hospital
ESI, along with controls partners Avi-on and Energy Management Consultants, LLC helped this MA hospital save over 800,000 KwH annually with an LED lighting retrofit and smart lighting controls.

LIFE TIME FITNESS
ESI designed 26 custom skus to upgrade or retrofit every Life Time Fitness location in the U.S. Ramping up production, we shipped one location per day for 100 days to meet the timeline of the project.
Stop & Shop
ESI was enlisted to create the RC Series retrofit kit for the existing Corelite Navigator II fixtures installed throughout the grocery chain, Stop & Shop.

Kinnelon High School
In response to national endorsements to enact measures to reduce the spread of SARS-CoV-2 and improve indoor air quality across high-traffic facilities including school buildings, Kinnelon High School utilized their ESSER II funding to implement automated disinfection via hybrid germicidal fixtures.